Skip to content
Price it / Estimating and Preconstruction

Estimates that start from your own closed jobs, not a blank template.

Your best pricing data is the work you have already built. We build preconstruction software on your real job history and your own cost codes: conceptual estimates, bid packages by trade, sub bids leveled line by line, and buyout that opens the subcontract. AI helps read and sort. It never touches a bid total without a person signing off.

The short version

Typical build
6 to 12 weeks
Built on
Your closed jobs and your cost codes
Covers
Estimate, bid packages, leveling, buyout, change orders
AI rule
No number in a total without a person's sign-off
Connects to
Your accounting and project software
Price
Scoped and quoted in writing before any build
What you get

What this does for your company.

A preconstruction team reviewing floor plans around a table
  • 01History

    Your job history, loaded

    Closed jobs, cost lines, and estimate revisions go in first, classified to your cost codes, so new estimates start from real numbers.

  • 02Packages

    Bid packages by trade

    One package per trade, with the budget carried from the estimate and invitations sent to the subs you choose.

  • 03Leveling

    Bids leveled line by line

    Every scope line on every bid is marked included, excluded, or unclear. A bid that is silent on a line is unclear, never assumed.

  • 04Buyout

    Award opens the subcontract

    An award is blocked until every gap on the winning bid is decided. Then the subcontract opens on the right cost code at the leveled amount.

  • 05Accuracy

    Estimate against actual

    As jobs close, the system compares what you estimated to what it cost, by category, and only suggests a correction once there is enough history.

  • 06Yours

    You own it

    The code lives in your GitHub account and the data in your own database from the first commit. If we part ways, everything keeps running.

Already running at a client

Estimating and bid leveling built on 23 real jobs

Read the case study
How it goes

Four steps. You see it working early.

Every build starts with a written scope. You see real software on your own data within weeks, and the plan changes when your team says it should.

  1. 01Weeks 1 to 2
    Step 01

    Load your history

    We extract your cost codes and load real jobs before designing a single screen.

  2. 02Weeks 3 to 6
    Step 02

    Estimate and packages

    Estimating and bid packages built against that history, tested on a live pursuit.

  3. 03Weeks 6 to 9
    Step 03

    Leveling and buyout

    Sub bids, leveling, award rules, and subcontract tracking.

  4. 04Week 9 on
    Step 04

    Change orders and accuracy

    Change order flow and the estimate-versus-actual view, tuned with your team.

Next step

Tell us how you do this today.

Twenty minutes on the phone. You leave knowing whether this is worth building, what it would take, and what it would connect to.